{"id":1650,"date":"2019-01-30T02:13:04","date_gmt":"2019-01-30T02:13:04","guid":{"rendered":"https:\/\/www.garoy.com\/projets\/commission-scolaires-2\/"},"modified":"2020-10-28T14:21:19","modified_gmt":"2020-10-28T18:21:19","slug":"school-boards","status":"publish","type":"projets","link":"https:\/\/www.garoy.com\/en\/projets\/school-boards\/","title":{"rendered":"School boards"},"content":{"rendered":"","protected":false},"featured_media":1539,"template":"","class_list":["post-1650","projets","type-projets","status-publish","has-post-thumbnail","hentry"],"acf":{"emplacement":"Quebec","categorie":[{"value":"institutionnel","label":"Institutional"}],"description":"<p>Garoy Construction has extensive building experience in the educational environment.<br \/>\nSince 2014, we have supplied the Commission scolaire de la Capitale with renovations and repairs. Thanks to our 24\/7 emergency service available 365 days a year, we can respond to any requests, anytime.<\/p>\n<p>In 1998, under the direction of the Commission scolaire des Premi\u00e8res-Seigneuries, Garoy undertook the modifications to the Albert Ouellet school in the Charlesbourg neighbourhood to add a teaching kitchen and a hospitality sector within Fierbourg.<\/p>\n<p>We also have a relationship of over 30 years with Coll\u00e8ge M\u00e9rici in Haute-Ville.<br \/>\nIn the late 80s, we began by building two student residences behind the college. Then, in the 90s and 2000s, we expanded the Sauvageau pavilion, a suspended space with classrooms above the existing gym. We then remodeled the chapel into a reception room. In the hospitality sector, renovations included a teaching kitchen and classrooms for theory and practice, such as a hotel bar and lobby. The college orthotics and prosthetics departments were also developed. Lastly, we completed diverse projects within the school including classroom design, library modifications, and much more.<br \/>\nSince 1990, we have handled the work for College M\u00e9rici in project management mode.<\/p>\n","client":"","annee_construction":"","budget":"","architectes":"","charge_projet":"","contremaitre":"","gallerie_images":false,"type":"Management"},"fimg_url":"https:\/\/www.garoy.com\/wp-content\/uploads\/2019\/03\/placeholder.jpg","fimg_url_thumb":"https:\/\/www.garoy.com\/wp-content\/uploads\/2019\/03\/placeholder-400x300.jpg","_links":{"self":[{"href":"https:\/\/www.garoy.com\/en\/wp-json\/wp\/v2\/projets\/1650","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.garoy.com\/en\/wp-json\/wp\/v2\/projets"}],"about":[{"href":"https:\/\/www.garoy.com\/en\/wp-json\/wp\/v2\/types\/projets"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.garoy.com\/en\/wp-json\/wp\/v2\/media\/1539"}],"wp:attachment":[{"href":"https:\/\/www.garoy.com\/en\/wp-json\/wp\/v2\/media?parent=1650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}